Monster Garage: The Game: Game Walkthrough and Guide

Home » Game Guides » Monster Garage: The Game: Game Walkthrough and Guide
March 4, 2022
7 minutes
81

By Jonny Gamer

Monster Garage: The Game: Passage
Monster Garage: The Game: Game Walkthrough and Guide
General Advice

Always First Order Materials So That Your Sweater As Soon As Possible Began The Manufacture of Special Units. You at this time start disassembling the car. From Ordinary Spare Parts First Order The Most Expensive and Those That Come Later in Time. If There Is Not Enough Money, SELL EXTRA PARTS TAKEN FROM THE MACHINE.

Mission 1. FORD BRONCO

Materials:
2 Steel Pipes

Spare Parts:
4 Monster Wheels
1 Reinforced Front Axle
1 REAR AXLE
1 Racing Seat Sparco
4 Reinforced 40-Inch Springs
1 Safa Bennzobac

Work:
REMOVE THE HOOD, RADIATOR GRILLE. From One Steel Pipe Assistants Make The Front Suspension of The Monster, From the Other Boiled Safety Framework. We Give The Grille of the Radiator Assistant for Alteration.
Remove The Front Wings and Give Them to Alternation to Assistants.
Remove The Front Wheels, Bridge, Springs. Cut Off Autogen Front Part of the Machine.
We Weld The Welded Front Suspension, Weld to It Modified Front Wings, To This Weld The Modified Radiator Grille.
Remove The Doors, Seats, Cut The Back Door. We Modify The Back Door With The Help of An Assistant.
Remove all Windows and Roof. We Modify The Roof. REMOVE THE REAR WINGS AND MODIFY THIM.
Remove The Rear Wheels, Bridge, Springs, Back Body.
PUT RACING DRIVER’S SEAT. Screw The Front Reinforced Springs. We Weld The Rear Wings. WE WELD THE SAFETY FRAME. We Screw The Fuel Tank.
We Weld The Roof, Screw The Doors, Remove The Glass Out Of The Door.
We Screw The Reinforced Front Axle, Screw The Monster to IT.
Screen Rear Reinforced Springs, Rear Axle, Monster Wheel.
WE WELD THE BACK DOOR.
On The 7th Day, We Order A 24-Pound Canister With A Nitrogen Zakin, Put It. NOW KRAVE Your Monster and Fight!

Mission 2. Mini Cooper

Materials:
4 120-Inch Pipes
3 Aluminum Cylinders
2 40-Inch Pipes
10 80-Inch Iron Bars
1 Metal Sheet 20×20

Spare Parts:
2 150-Strong Motors
2 Steel Chains
2 Sets of Gear
2 CATERPILLARS FOR SNOW RIDING (Crawler Tapes)
2 Disk Brakes + Caliper
1 Set of Main Hydraulic Cylinders (Master Cylinders)
2 BRAKE LEVER (BRAKE LEVER)
4 Short Hydraulic Shock Absorber (Short Hydraulics)
1 Left Ski
1 Right Ski

Work:
Cook Rollcage From Pipes (Welded Construction On Which All Mechanisms Will Be Attached)
Open The Trunk Door, Remove The Back Seat, Sell It.
From Each Aluminum Cylinder We Make 10 Small Rollers (Support Rollers), Everything Shold Be Obtained 30 Pieces.
Take Out All The Seats, Rug. SELL PASSENGER SEAT, SALON RUG.
We Make A Caterpillar Mechanism from Our Support Rollers and Other Materials.
COOK A FRAME FOR MOTORS FROM STEEL BARS.
We Screw The Driver’s Seat Back, Remove The Bumper. Cut a Piece of Bottom Autogen. Install Rollcage.
We Make The Caterpillar Suspension. We Make The Left and Right Caterpillage Drive.
We Put The Main Hydraulic Cylinders at the Front of the Front Passenger Seat. Screw The Rear Bumper Back. We Put Skis.
WE WELD THE CATERPILLAR SUSPENSION, PUT THE TRACKED MECHANISM. Cover from Above Motor Framework.
Made By .
Install The Caterpillar Drives, Then Put The Motors and . WE PUT THE CATERPILLARS THEMSELVES (CATERPILLAR RIBBONS).

Mission 3. VW Beetle

Project No. One

Materials:
1 Steel Trumpet
9 Metal Sheets
4 Iron Bruck

Spare Parts:
1 Power Hydraulic ARM (Actuator Hydraulic ARM)
1 Engine
1 AB FOAM (Epoxy Resin or Any More Sealant)

Work:
We Make: The Main Body, Rotating Body, Fastener of the Front Bumper, Front Bumper.
Remove and Sell Front Bumper. Take Everything Out Of The Cabin and Sell The Back Seat. Open The Trunk and Cut Off From There A Piece Of Metal.

We Manufacture 2 Threshold, Propeller, Turning Steering Wheel.
Weld The Fastener of The Front Bumper, Then of the Bumper Itself.
We Make The Second Steering Wheel Of Rotation.
Put The Main Body, Then Hydraulic Drive.
We Weld Thresholds. WE PUT THE ROTATING HOUSING FOR THE ENGINE. We Mean The Car Foam. We Put The Engine, Turning the Rotation and Propeller.
We Put The Seats, Weld Back A Piece of Iron, Which Cut Off From The Back Of the Case.
On the 7th Day, Buy Yourself a Crocodile on The Roof, Exhaust Pipe and Smaller Wheels.

PROJECT NUMBER 2

Expendable Materials:
2 Steel Pipes
8 Metal Sheets
7 Iron Bruckov

Spare Parts:
2 Electric Motors
1 Clutch
1 AB FOAM (Epoxy Resin or Any More Sealant)
1 Front Presenter
1 Rotor (Propeller)

Work:
We Begin to Make A Fastening for the Front Bumper, The Rear Leading Shaft, Left and Right Threshold.
Remove The Front Bumper, Sell It. Remove The Driver’s Seat. We Make A Special Front Bumper.
Take Out All The Details of the Cabin and Sell The Back Seat.
Open The Trunk and Cut Out a Piece Of Metal From Behind.
WE MAKE 3 POWER STEERING (WING).
WE WELD FASTENERS FOR THER FRONT BUMPER. We Main Building. WE WELD THE FRONT BUMPER. We Make A Turning Housing. We Weld Thresholds.
WE WELD THE MAIN BODY. Screw The Seats, Then Grip.
We Make The Mechanism of Rotation Of The Case (Slider Frame).
Put The Rear, Front Leading Shafts, Screw The Screw. Soak Up a Foam AB.
We Weld The Mechanism of Rotation Of The Case. Install The Rotating Case and Put The Steering Wheel On It. Weld Back A Piece of Iron That Cut Off From The Back Of the Housing.
On the 7th Day, Buy Yourself a Crocodile on The Roof, Exhaust Pipe and Smaller Wheels.

Mission 4. Ambulance

Project No. One

Expendable Materials:
5 Steel Pipes
4 Iron Bruck

Spare Parts:
8 110 Pound Metal Pancakes
1 V-8 517 Energin
1 Device for Driving On The Rear Wheels (Vee-Drive)

Work:
We Make: Engine Mount, Main Frame (Rollcage), Pancake Holders.
REMOVE THE REAR WHEELS, REAR AXLE. We Modify The Rear Axle.
REMOVE THE HOOD, RADIATOR GRILLE. Remove The Engine and Sell It.
Take Out Medical Equipment and Sell It.
Cut the Hole in the Van Housing. We Weld There A New Engine Mount.
Install The Main Frame, Then Welded Pancake Holders.
WE PUT THE HOOD AND GRILLE OF THE RADIATOR BACK.
We Weld The Modified Rear Axle We Weld.
Hide Pancakes, Put The Engine, Screw The Wheels Back.
ON DAY 7, PUT RACING SEATS AND NEW WHEELS.

Mission 5. Limousine

PROJECT NUMBER 3

Expendable Materials:
7 Metal Sheets
9 Iron Bruckov

Spare Parts:
1 Flasher (Chandelier On The Roof)
1 Cylinder (Tube)
1 Spiral
1 Little Gear
1 PIPE (PIPE)
1 LARGE ELECTRIC MOTOR
1 Chain
1 Cable
1 Big Gear
1 Small Electric Motor

Work:
WE Make: The Hull Be Installed, The Deviation Controller (Yaw Controller), The Casing of the Rotary Mechanism (Slider Frame), The Sand Drawer.
We Take Out of the Limousine Salon and Sell: Back Seats, TV, Mini Bar, Side Seat, Trim.
Cut On The Roof Hole for Flasher. We Make A Swivel Mechanism (Sliding Frame).
Open Both Rear Doors And Weld The Housing Of The Rotary Mechanism.
We Make Aiming Device. WE WELD THE CASE FOR A BOX WITH SAND.
Install The Box with Sand, Flasher on The Roof, Screw The Little Electric Motor.
Put The Swivel Mechanism, Deflection Regulator. We Screw The Big Electricotor. WE WELD THE CYLINDER, AIMING DEVICE.
Install: Large Gear, Spiral, Small Gear, Cable, Chain. WE WELD THE TRUMPET.
ON DAY 7, PUT ON CAR OF DIFFERENT KINDS .

Mission 6. Ford Mustang

PROJECT NUMBER 2

Expendable Materials:
3 Metal Sheet 20×20

4 Iron Bruck

Spare Parts:
1 Drum Knife from Lawn Mowers
1 Vacuum Cleaner
1 Battery
1 START (WRENCH)
1 Grass Box
1 Wire
1 Hose for Vacuum Cleaner

Work:
We Manufacture: The Main Body, Moving Housing, Vacuum Box.
Take Out The Entire Lounge Lounge: BACK SEAT, Front Seats. All Sell, Except The Driver’s Seat.
Cut Both Exhaust Pipes and Give Them to Alteration. REMOVE THE FUEL TANK.
Cut Out a Piece of Metal From The Trunk and Sell It. WE WELD THE MAIN BODY, THEN SCREW THE BENZOBAK.
Breed Modified Exhaust Pipes. Screw The Battery, Start-Up (Launcher), moving housing.
Remove The Bumper and Screw The Vacuum Box.
We Screw The Vacuum Cleaner, Grass Box. WE PUT THE WIRE AND HOSE FOR A VACUUM CLEANER.
FINISH Back: REAR BUMPER, ROOF AND DRIVER’S SEAT. Install The Knife from the Lawn Mower.
ON THE 7TH DAY, PUT Yourself Good Wheels.

    How do you rate Monster Garage: The Game: Game Walkthrough and Guide ?

    Your email address will not be published. Required fields are marked *